Saturday, March 24, 2007
Bathroom 2007
Last year I blew out the master bathroom and got it finished up nicely. Now I've started "the boys'" bathroom. This bathroom suffered from the same ailments: improperly mounted toilet ruined the OSB subfloor, ugly cabinets, cheapo builder-standard one-piece shower/tub and chrome faucets, cheap (yet durable and slightly attractive) linoleum floor. Posted are some before pictures and some of the tearout pictures. Note in one of the pictures the screwdriver that slid easily through the 3/4" subfloor. One picture shows the cutout subfloor and the reinforcement I put in around where the toilet will go
Tuesday, March 06, 2007
Dunes- Dad and Dylan trip
Dylan and I went to the sand dunes. We loaded up Amy's 400ex and his LT50, a tent, a cooler, a shovel, firewood, some hot dogs and marshmallows, and sleeping bags. Dylan got to cook a hot dog over a fire, then "cook" marshmallows. We had glow sticks, sunburns, and a good time. He liked sleeping in the tent, riding his quad, but mostly loved playing in the sand. We ended up digging a gigantic hole that he rode his quad in.