Sunday, April 21, 2013

Bad roof, good roof, installment 2

This is my third roof project at this house. As always, the roof tiles are fine. It is the tar paper below that fails. In this case, the fascia board rotted away as well as the osb sheeting. Note this was 15' above the ground.

This phone is so stupid. I keep trying to attach pictures and it keeps NOT doing what I want. Well if there are no pictures sorry, I tried.

Monday, April 08, 2013

Good morning scooter time

The boys always sneak a few minutes of scooter time in before I take them to school. I made them pose by the flowers.